SAKO Single Phase 380V Solar Water Pump System, 18kW with Solar Panel Solar Inverter Control System

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-20 23:34

  • Browse the number:

    218

Send an inquiries
+
Shenzhen Kingsako Electronics Co. Ltd
Contactaixin:

Contactaixin:

sakopowersupply(Ms.)  

telephone:

Area:

Beijing

Address:

Shenzhen King SAKO, C Building,HuangGangLing Industrial, Park, XiXiang, BaoAn, Shenzhen, Guangdong, China (518126)

Website:

http://sakopowersupply.jinyuan818.com/

+
Model Number: SKSP-18KW Brand Name: SAKO Key Specifications/Special Features: SAKO single phase 380V solar water pump system 18kW with solar panel, solar inverter control systemSAKO solar pumping system is perfectly suitable for areas without grid, not only is the initial investment way lower than setting up transmission lines for long distance, but also the total investment, operation and maintenance costs are lower than diesel generator with 3 years system operation, stable water supply increases agriculture and forestry outcome, improved environment and living quality, ensures social stabilityDC solar pumping system consist of solar panel, solar pump inverter, AC 3 phase 220V or 380V pumpIt can be applied for domestic water (ground water), agricultural irrigation, forestry irrigation, desert control, pasture animal husbandry, town and city water supply, waste water treatment engineering, municipal engineering, city center squares, parks, tourist sited, resorts and hotels, the landscaped and fountain system and moreDetermine the optimal average daily operating time and range of speed governingChoose the optimal head and capacity of the pump
Determine the maximum power of PV modules, the best working voltage and method of connection
Shipping Information:
  • FOB Port: Shenzhen, Guangzhou, Shanghai
  • Lead Time: 10 - 15 days
Main Export Markets:
  • Eastern Europe
  • North America
  • Mid East/Africa
  • Central/South America
  • Asia
  • Western Europe
  • Australasia